Steer, SJ and Nuttall, WJ and Parks, GT and Goncalves, LVN (2011) Predicting the contractual cost of unplanned shutdowns of power stations: An accelerator-driven subcritical reactor case study. Electric Power Systems Research, 81. pp. 1662-1671. ISSN 0378-7796
Full text not available from this repository.
| Item Type: | Article |
| Additional Information: | Info sources = author offprint, WoS Sep 11 |
| Uncontrolled Keywords: | Electricity Unplanned shutdown Cost Intermittency Accelerator-driven subcritical reactor Nuclear power GENERATION |
| Subjects: | UNSPECIFIED |
| Divisions: | Div A > Energy |
| Depositing User: | Cron Job |
| Date Deposited: | 07 Nov 2011 16:56 |
| Last Modified: | 20 May 2013 01:34 |
| DOI: | 10.1016/j.epsr.2011.03.023 |
|---|