De Lessio, M and Wynn, DC and Clarkson, PJ (2009) Communicating planning change activity using a matrix-based approach. In: 11th International Design Structure Matrix Conference, DSM'09, 12-10-2009 to 13-10-2009, Greenville, SC, USA pp. 285-288..
Full text not available from this repository.
| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
| Additional Information: | Event type = conference |
| Uncontrolled Keywords: | process management |
| Subjects: | UNSPECIFIED |
| Divisions: | Div C > Engineering Design |
| Depositing User: | Cron Job |
| Date Deposited: | 28 Oct 2011 16:38 |
| Last Modified: | 20 May 2013 01:35 |
| DOI: | |
|---|
Actions (login required)