Le, HN and Wynn, DC and Clarkson, PJ (2010) Modelling the influence of uncertainty, process architecture and feedback dynamics on PD projects. In: UNSPECIFIED pp. 113-124..
Full text not available from this repository.| Item Type: | Conference or Workshop Item (UNSPECIFIED) |
|---|---|
| Subjects: | UNSPECIFIED |
| Divisions: | Div C > Engineering Design |
| Depositing User: | Cron Job |
| Date Deposited: | 08 Apr 2012 19:02 |
| Last Modified: | 17 Dec 2012 01:07 |
| DOI: |
Actions (login required)
| View Item |

