Considerations for monitoring of deep circular excavations

Schwamb, T and Elshafie, MZEB and Soga, K and Mair, RJ (2016) Considerations for monitoring of deep circular excavations. Proceedings of the Institution of Civil Engineers: Geotechnical Engineering, 169. pp. 477-493. ISSN 1353-2618

Full text not available from this repository.

Abstract

© ICE Publishing: All rights reserved. Understanding the magnitude and distribution of ground movements associated with deep shaft construction is a key factor in designing efficient damage prevention/mitigation measures. Therefore, a large-scale monitoring scheme was implemented at Thames Water’s 68 m deep Abbey Mills Shaft F in East London, UK, constructed as part of the Lee Tunnel Project. The scheme comprised inclinometers and extensometers which were installed in the diaphragm walls and in boreholes around the shaft to measure deflections and ground movements. However, interpreting the measurements from inclinometers can be a challenging task, as it is often not feasible to extend the boreholes into ground unaffected by movements. The paper describes in detail how the data are corrected. The corrected data showed very small wall deflections of less than 4 mm at the final shaft excavation depth. Similarly, very small ground movements were measured around the shaft. Empirical ground settlement prediction methods derived from different shaft construction methods significantly overestimate settlements for a diaphragm wall shaft. The results of this study will help to inform future projects, such as the forthcoming 25 km long Thames Tideway Tunnel with its 18 deep shafts being constructed adjacent to existing infrastructure.

Item Type: Article
Subjects: UNSPECIFIED
Divisions: Div D > Construction Engineering
Div D > Geotechnical and Environmental
Depositing User: Cron Job
Date Deposited: 17 Jul 2017 19:27
Last Modified: 21 Nov 2017 03:08
DOI: