CUED Publications database

Principal Tower axial shortening L0-16: Research data supporting "Monitoring the axial displacement of a high-rise building under construction using embedded distributed fibre optic sensors"

de Battista, N and Harvey, R and Cheal, N and Kechavarzi, C Principal Tower axial shortening L0-16: Research data supporting "Monitoring the axial displacement of a high-rise building under construction using embedded distributed fibre optic sensors". (Unpublished)

Full text not available from this repository.

Abstract

Axial displacement of columns C8 and C9 and walls W1 and W2 at Principal Tower (London, UK) measured between mid-October 2016 and end March 2017 from levels 0 to 16.

Item Type: Article
Uncontrolled Keywords: axial shortening high-rise tall buildings jumpform monitoring distributed fibre optic sensors Brillouin sensing
Subjects: UNSPECIFIED
Divisions: UNSPECIFIED
Depositing User: Cron Job
Date Deposited: 17 Jul 2017 19:54
Last Modified: 10 Aug 2017 01:36
DOI: